mscrm-addons.com logomscrm-addons.com logo
  • Release History
  • Knowledge Base
  • Documentation
  • Contact Support
  • Release History
  • Knowledge Base
  • Documentation
  • Contact Support
home/Knowledge Base/AttachmentExtractor (AE)/What Happens After You Deploy AttachmentExtractor: Storage & Cost Savings in Dynamics 365

What Happens After You Deploy AttachmentExtractor: Storage & Cost Savings in Dynamics 365

127 views 1

Running out of Dataverse storage? Paying more for file and email data than you should?

AttachmentExtractor helps Dynamics 365 users offload attachments, notes, and emails – without any changes for end users. It runs quietly in the background, reducing storage costs while keeping everything accessible.

If you’re considering deploying AttachmentExtractor (or just want to know what happens after you do), here’s a clear breakdown of what you can expect—step by step.

Step 1: Seamless Setup with Minimal Configuration

Once you’ve licensed AttachmentExtractor, implementation is fast and straightforward. The solution connects to your Dynamics 365 (Dataverse) instance and your chosen file storage location—either SharePoint or Azure Blob Storage.

Initial setup includes:

Initial setup includes:

  • Registering the service
  • Defining extraction rules (entity types, filters, conditions) and, optionally, setting extraction schedules (real-time or batch-based) — Most customers skip custom schedules, as the impact is typically minimal unless dealing with high-volume workloads.
  • Configuring a delay for extraction — The most common setup uses a delay of 1 week or 1 month before attachments are moved. This ensures recent or day-to-day-relevant files remain immediately accessible.
  • Verifying that users can still see and open files exactly as before

Most customers are up and running in a test environment within 30–60 minutes.
Behind the scenes, AttachmentExtractor operates in near-real-time by default—working in batches and checking for new attachments every 2.5 minutes.

Step 2: Data Begins Moving—But Nothing Looks Different

As soon as the service is running, AttachmentExtractor begins scanning eligible records for:

  • Tracked emails (ActivityPointerBase)
  • Notes and attachments (AnnotationBase and Attachment)

When extracted, content is moved to your external storage—while references in Dynamics remain intact.

Users still access files through the timeline or record forms exactly as before. That’s because the tool replaces extracted content with a seamless passthrough reference. There are no broken links, no UI alerts, and no training required for end users.

Step 3: Real-Time Storage Reduction

Once active, AttachmentExtractor starts delivering its primary value: lowering your storage usage across the most expensive areas of Dataverse.

Typical reductions include:

  • Up to 40% offloaded from database (email content)
  • Up to 80% offloaded from file capacity (attachments and notes)

The results are visible in your Power Platform Admin Center after 24 hours and continue accumulating as new items are extracted.

In short, every day the service runs, your cost exposure decreases.

Step 4: Full Control and Customization

AttachmentExtractor isn’t just a one-size-fits-all solution. It’s built to flex around your environment and compliance requirements.

You can:

  • Prioritize by file size to extract large files first
  • Set whitelist/blacklist rules by entity, owner, or content type
  • Exclude sensitive records (e.g., contracts, legal documents)
  • Schedule extraction windows to run outside business hours
  • Monitor progress using the built-in dashboard

If needed, you can pause, resume, or adjust your configuration at any time without disrupting service.

Step 5: Long-Term ROI and Scalability

Once implemented, AttachmentExtractor operates continuously in the background. Most customers describe it as a “set it and forget it” tool—with measurable ROI from month one.

Key outcomes:

  • Avoided  storage purchases
  • Reduced pressure on database size limits
  • Lower risk during large-scale data migrations or cloud transitions
  • Reduce storage costs by up to 90% (LINK TO CASE STUDY)

Because your files are stored in your own SharePoint or Azure Blob, your data sovereignty and compliance posture remain intact.

Getting Started with AttachmentExtractor

If you’re using Dynamics 365 to track emails, manage cases, or log customer communications, chances are your database is growing faster than you’d like—and costing more than it should.

AttachmentExtractor helps you get ahead of that growth without adding complexity or user burden. It’s simple to deploy, invisible to your teams, and built to scale with you.

Get started today: https://www.mscrm-addons.com/Products/AttachmentExtractor

Was this helpful?

1 Yes  No
Related Articles
  • The Hidden Cost of CRM Storage — And How to Eliminate It 
  • How to Eliminate Excess Storage Costs in Microsoft Dynamics 365 Without Losing Access to Emails and Attachments
  • Buried in Storage Fees? Here’s How to Cut Dynamics 365 Costs Fast
  • AttachmentExtractor: Best practices for  Dynamics 365 on-premises to online migration projects 
  • Impact of AttachmentExtractor on AI capabilities in Microsoft Dynamics 365 
  • AttachmentExtractor: Progress, Statistics and Service Logs 
Latest Articles
  • Recap: Community Summit 2025
  • Locating Raw Inputs and Outputs in Power Automate
  • Step by Step: How to execute an OCA in a Power Automate flow 
  • Stop Losing Time & Money: How Manual Document Processes Hurt Your Business
  • The Hidden Cost of CRM Storage — And How to Eliminate It 
Popular Articles
  • DocumentsCorePack Template Designer – Getting Started
  • Step-by-Step: How to configure a One-Click-Action
  • Application Access for Dynamics 365
  • How to find your environment’s unique name in Microsoft Dynamics 365
  • How licenses are counted
Top Rated Articles
  • “Undefined”-labels in Chrome and Edge 114 and higher
  • How to insert Condition Fields in DocumentsCorePack Templates designer
  • Important information for Dynamics 365 online customers using DocumentsCorePack and/or AttachmentExtractor
  • How to activate the DocumentsCorePack Connector for PowerApps & Microsoft Flow
  • How licenses are counted
Categories
  • *News and General Infos* 66
  • Webinars 46
  • Template Designer(DCP 197
  • DocumentsCorePack(DCP 263
  • TelephoneIntegration (TI 65
  • AttachmentExtractor (AE 76
  • PowerSearch (PS 50
  • ActivityTools (AT 61
  • SmartBar (SB 54
  • GroupCalendar (GC 47
Our Vision

“We see it as our purpose to provide products that simplify and speed up our customers’ Microsoft Dynamics 365 experience.”

Knowledgebase
LogIn
mscrm-addons.com
  • Products
  • Online Shop
  • Downloads
  • My Account
About Us
  • About Us
  • Case Studies
  • Newsletter
  • Partner Program
  • Contact
Support
  • Support
  • Terms & Conditions
  • Documentation
  • Webinars
  • Legal Documents
  • Impressum
  • © 2025 www.mscrm-addons.com. All Rights Reserved.